Strengthening of Grinding Building Slab Batu Hijau Copper
The Grinding Building mill deck level slab is required to carry relatively heavy live loads ( metric ton/m#178;) caused by steel mill liners being piled on them which are used to reline the Ball and SAG Mills during biannual shutdowns. In addition to the steel liners, heavy equipment is often carried by the structural concrete slab.